In the Amazon - Krefeld project we installed a new logistics line with parcel sorting system, including the installation of conveyor designs and conveyor systems, installation of new racking systems, installation of safety elements on conveyor belts, cable routes, rewiring of machinery and equipment, installation of lighting and switchgear, wiring of new switchgear and more.
- Complete installation of the new logistics centre
- Mechanical assembly of the conveyor systems
- Installation of the new racking, storage and logistics systems
- Assembly of steel structures and steel stairs
- Assembly and wiring of safety equipment
- Assembly and wiring of single-purpose machines
- Installation of hall lighting
- Locksmith services
- Welding services
- Wiring of control panels
- Installation of fibre optic cables in automation technology
- Assembly and disassembly of cable trays and covers
- Wiring and screwing of workplaces
- Installation of new wiring